Using the default keybindings, shift + left mouse, to copy another power switch settings instead just removes the power switch wires. Most likely because the same binding is used to "remove pole cables".
I would suggest shift + LMB prioritizes copying settings if another power switch is copied, and removing cables if there is no entity to copy from.
[0.13.8] Cannot copy power switch entity settings to another
- MasterBuilder
- Filter Inserter
- Posts: 353
- Joined: Sun Nov 23, 2014 1:22 am
- Contact:
[0.13.8] Cannot copy power switch entity settings to another
Give a man fire and he'll be warm for a day. Set a man on fire and he'll be warm for the rest of his life.