My problem is that the electric networks are momentarily joined so they are 'polluted' for 5 seconds (the minimum precision time for accessing usage data). I can see several ways of mitigating this (in rough order of preference):
- Add a way to list compatible entities in the power pole prototype
- Don't momentarily merge electric networks if they are disconnected again on the same tick
- Add a prototype flag to disable automatic connections entirely