My suggestion is quite simple - when construction bots replace destroyed power poles, these power poles should have the same wire configuration as before destruction.
Reasoning - I have many power-hungry production facilities turned on/off automatically by circuit conditions linked to switch - some poles have to be shift-clicked and power wires connected only to selected poles - otherwise the switch is bypassed and facility is continuously on. When critters destroy such a pole, the new pole is connected to everything in reach.
