- 20 forge design upgradeable all the way to electric furnaces without reconfiguration.
- No need to change internal belt layouts when upgrading to electric furnaces
- 5x5x2 design for better parallel processing and lane utilization
- 2-lane ore input split into two 1-lane tracks without splitting lanes. I later upgraded the ore feed to a right-hand load balancer (not in the shot)
- Fuel feed line that can be cut off if/when I upgrade to electric
- 13k Output buffer. Maintains full smelting throughput before I've even hooked it up to anythig.
- Quad splitter to ration out consumption as I expand
- Single-to-double lane split shift.
- Still expandable layout (if for some crazy reason I need more)
