Automation 2 research cost inconsistent
-
- Manual Inserter
- Posts: 1
- Joined: Fri Jun 02, 2017 11:50 am
- Contact:
Automation 2 research cost inconsistent
I was playing a new game (0.15.9) railworld setup with no biters and i noticed that when I pocket crafted 40 red science packs and added this to the research building, After those 40 packs were consumed the research was only half done. after thinking i made the wrong amount of science packs i crafted another 20 and that again only gave me another quarter of the progress bar. Then I looked at the research after it was finished and noticed that the research takes 40 stacks of 2 instead of the assumed 40 science packs. I don't know if it is a bug, a typo or what but it was not consistent with the rest of the research.
- Attachments
-
- Picture of Automation 2 requirements
- issue with science.jpg (374.19 KiB) Viewed 7665 times
Re: Automation 2 research cost inconsistent
Is consistent with many items in the tree which require more than 1 pack of some type per cycle.
Rail Stuffs
Inserter Capacity
Advanced Oil
Cars
Grenade Damage
Combat Robot Damage
Military 3-4
and probably several I'm not thinking of.
Rail Stuffs
Inserter Capacity
Advanced Oil
Cars
Grenade Damage
Combat Robot Damage
Military 3-4
and probably several I'm not thinking of.
- bobingabout
- Smart Inserter
- Posts: 7352
- Joined: Fri May 09, 2014 1:01 pm
- Contact:
Re: Automation 2 research cost inconsistent
There are actually other researches that require 2 stacks of red science, but I agree, this is, as far as I know, the only instance of a research costing multiple of only 1 science pack.
I think one of the effects of costing 2 instead of 1 is that it will consume the pack twice as fast, which could also be accomplished by halving the research time. So there's really no reason why it should cost 40 stacks of 2, rather than 80 stacks of 1.
I think one of the effects of costing 2 instead of 1 is that it will consume the pack twice as fast, which could also be accomplished by halving the research time. So there's really no reason why it should cost 40 stacks of 2, rather than 80 stacks of 1.
Re: Automation 2 research cost inconsistent
I changed the automation and fluid wagon. I also changed the automation icon to use the production icon, so it is not mistaken with logistics.