Concrete placement, by hand(manual) or by robot there is diffrent beheave near water.
When placing concrete by hand near water, there seems to be a minimal distance of 2or3 that you can't place concrete.
When you make a blueprint of concrete, and paste it near water, your able to concrete those places..
One of the 2 above seems to be wrong.
[0.14.22] Concrete placement, by hand(manual) or by robot
[0.14.22] Concrete placement, by hand(manual) or by robot
Last edited by rorror on Mon Mar 06, 2017 4:08 pm, edited 1 time in total.
Re: [0.14.22] Concrete placement, by hand(manual) or by robot
The image "With robots" you can see that robots can place near water.
The image without robots, you can see the diffrence (i later pasted the blueprint over it, so robots can fill it in)
The image without robots, you can see the diffrence (i later pasted the blueprint over it, so robots can fill it in)
- Attachments
-
- without robots-diffrence.png (1.31 MiB) Viewed 1385 times
-
- with robots.png (1.07 MiB) Viewed 1385 times
Re: [0.14.22] Concrete placement, by hand(manual) or by robot
No, it's limited just like manual building is.
Can you reproduce it without any mods? Because I suspect a mod you're using is changing things.
Can you reproduce it without any mods? Because I suspect a mod you're using is changing things.
If you want to get ahold of me I'm almost always on Discord.
Re: [0.14.22] Concrete placement, by hand(manual) or by robot
I have tested it in a older save game, a mod should have changed it.
However i like it more when it is filled to the water. Its that squary there.
However i like it more when it is filled to the water. Its that squary there.