I made an Excel template for planning layouts at work.
I made an Excel template for planning layouts at work.
Hi everyone,
I was bored at work the other day and made a Factorio Excel template to plan out some stuff for my game later. It's not very elaborate, but good enough for furnace layouts and stuff.
https://docs.google.com/spreadsheets/d/ ... 1511466101
I am not very good with google docs, so I hope this somehow works.
Edit: Looks like Google docs doesn't like Excel formatting. So No vertical text in google docs.
Cheers
TypeO
I was bored at work the other day and made a Factorio Excel template to plan out some stuff for my game later. It's not very elaborate, but good enough for furnace layouts and stuff.
https://docs.google.com/spreadsheets/d/ ... 1511466101
I am not very good with google docs, so I hope this somehow works.
Edit: Looks like Google docs doesn't like Excel formatting. So No vertical text in google docs.
Cheers
TypeO
-
- Manual Inserter
- Posts: 4
- Joined: Tue Feb 10, 2015 11:58 am
- Contact:
Re: I made an Excel template for planning layouts at work.
I took a look, and after a little while I thought "Why bother with this, why not play the real game instead of trying to play it in Excel".
Then I realized that was exactly what you were doing! Playing the game at work, or as close as you could. I know the feeling, I'm at work typing this, thinking of what I'll build when I come home.
This is more powerful then crack.
Then I realized that was exactly what you were doing! Playing the game at work, or as close as you could. I know the feeling, I'm at work typing this, thinking of what I'll build when I come home.
This is more powerful then crack.
Re: I made an Excel template for planning layouts at work.
That's pretty accurate. If Factorio would run better from an USB stick, I would probably play it at work. But it doesn't, so I'll play with my Excel sheets.Starwalker wrote:This is more powerful then crack.
Re: I made an Excel template for planning layouts at work.
It doesn't? It should. What did you try? What does it do?TypeO wrote:If Factorio would run better from an USB stick, I would probably play it at work. But it doesn't, so I'll play with my Excel sheets. :D
Re: I made an Excel template for planning layouts at work.
It works, but stutters hard right from the beginning. I don't think it's because of the stick, probably because of my shitty work computer.
Re: I made an Excel template for planning layouts at work.
draw.io works pretty well for this, too. I find its useful to make a drawing of complex factories before construction to make sure everything flows neatly.
To open it in draw.io login to google and select open in draw.io Pro.
To open it in draw.io login to google and select open in draw.io Pro.
Re: I made an Excel template for planning layouts at work.
I'll stick with ACAD for now (at least until I adapt Revit to my cause...).
- Attachments
-
- RR-IMPORT-EXPORT.png (101.77 KiB) Viewed 11091 times
Re: I made an Excel template for planning layouts at work.
I like how you can show the power under there!
Re: I made an Excel template for planning layouts at work.
TypeO, I liked your sheet but it had a bunch of problems from importing from Excel. So I reworked it to use Unicode arrow characters (→←↑↓↰↱↲↳ etc) instead of rotated text, fixed cell size and border issues, reworked some machines, and made an example. It seems to work a lot better imo:
https://docs.google.com/spreadsheets/d/ ... sp=sharing
Some scrrenshots:
The original of this design: (https://i.imgur.com/aWXV8VC.png)
https://docs.google.com/spreadsheets/d/ ... sp=sharing
Some scrrenshots:
The original of this design: (https://i.imgur.com/aWXV8VC.png)
Re: I made an Excel template for planning layouts at work.
Yeah, that's way better. Thanksinfogulch wrote:TypeO, I liked your sheet but it had a bunch of problems from importing from Excel. So I reworked it to use Unicode arrow characters (→←↑↓↰↱↲↳ etc) instead of rotated text, fixed cell size and border issues, reworked some machines, and made an example. It seems to work a lot better imo:
That's cool. I work also work with CAd a bit, but you are the first I have seen that has the black backround activated.DerivePi wrote:I'll stick with ACAD for now (at least until I adapt Revit to my cause...).
Cool, will look into it. thanksonebit wrote:draw.io works pretty well for this, too. I find its useful to make a drawing of complex factories before construction to make sure everything flows neatly.
Re: I made an Excel template for planning layouts at work.
For underground belts, you can only go 4 tiles, not 5.
-
- Burner Inserter
- Posts: 6
- Joined: Sat Feb 21, 2015 1:56 am
- Contact:
Re: I made an Excel template for planning layouts at work.
I just doodle them on paper. It's more about the idea, coming up with a different setup, the exact alignment is secondary.