While in remote view on Nauvis, selecting an ore patch within range of a roboport connected to the logistic network using the pipette tool, defaults to using the burner drill, even if only electric drills are on the logistic network.
Please see attached snapshots. In this example, the logistic network has 0 burner drills available, and 528 electric drills available. When using the pipette on the coal patch next to the roboport, the burner drill is selected for construction.
Placing the burner drill gives the warning that 0 burner drills are available on the network.
Manually selecting and placing the electric drill will construct as normal.
Confirmed that the player's personal inventory does not impact this behavior.
Using pippet tool on ore patch in remote view - Wrong drill selected.
-
- Manual Inserter
- Posts: 3
- Joined: Thu Nov 07, 2024 2:24 am
- Contact:
Re: Using pippet tool on ore patch in remote view - Wrong drill selected.
I guess you are playing on 2.0.14. This was already changed in 2.0.15 (that right now is in experimental branch). 118469
-
- Manual Inserter
- Posts: 3
- Joined: Thu Nov 07, 2024 2:24 am
- Contact:
Re: Using pippet tool on ore patch in remote view - Wrong drill selected.
Correct, I was playing on 2.0.14. I'm seeing it fixed now in 2.0.15. Thank you!