So, does the use of long inserters here cause a lower bottleneck than splitting the input ore and running on the outside, with plate output dumped on a single belt down the middle of some furnaces?O_Prime wrote:Smelters also looks almost like mine setup)show
This can be scaled, with a single belt between each column of furnaces, alternating input and output, allowing all furnaces to be fed with fast inserters and be buffed with speed modules.
Has anyone done the math/experiments on this issue?