TL;DR
Add peak values to the graphs. Swap production and consumption panes on one of them.What ?
The Production and Electrical Network GUIs should show the peak value for the period being graphed, for both production and consumption.The Production GUI has production in the left pane and consumption in the right pane.
The Electrical Network GUI has consumption in the left pane and production In the right pane.
Swap one of them to be consistent.
Why ?
I am often wanting to know what the peak value on the graph is. This is true for both Production and Electrical Network. What was my peak consumption wattage for the past 1m? 10m? What did my iron plate consumption peak at over the last 1h?This could be as simple as displaying the peak in the upper left or right corners of each graph pane (good enough for me), or as complicated as showing a 'proper' graph scale.
The swapped consumption and production panes result in moments of confusion. I may have been looking over power, then looking over production wondering why my consumption values are so high; Because I was looking in the wrong pane.