Sorry, I was adding a logger. Fixed. -Logging function now available to watch the global.ACTIVE. Enable byLight wrote:
/c remote.call("UraniumPower","togglelog")
Logs are in script-output/UraniumPower
Logging is expensive in ticks so watch out.
The turbine-generator now make 43.5 MW. Two of them make 93MW. The pump's internal fluidbox needed to be increased to handle the new heat flux. The total amount of pressurised-water in the reactor,pumps,and hotlegs are very important and very sensitive. Do make sure you have enough but not too much or steam production will not keep up. The reason for this is because fluid flow has a certain max rate and thus heat flow is also capped because of this.Light wrote: But the steam generator now continues to rapidly lose steam when at 70% or greater production, despite receiving enough water to keep going. (Improved from >50%)
I did not notice that the pump only held 100 water before and was changed now to 600. Any reason why this was increased?