When working in remote view to modify a machine ghost, such as an assembler to add modules, if the machine ghost is fulfilled by a bot the menu is closed. If possible, I would prefer to keep this window open and allow me to keep modifying modules even after it is built.
Not sure if this is a bug or intended behavior.
- Toozinger
[2.0.14] Selection screen canceled when ghost entity is fulfilled
Re: [2.0.14] Selection screen canceled when ghost entity is fulfilled
Bot placement while editing ghost logistic connection's enable condition also closes the window for the item filter while the logistic connection "attached window" stays.
Re: [2.0.14] Selection screen canceled when ghost entity is fulfilled
This sounds like a duplicate of 118545 which should be fixed for 2.0.18.