Search found 6 matches

by Stin
Sat Nov 10, 2018 7:46 pm
Forum: Railway Setups
Topic: 4 Lane Railsystem with Solar and Piping (Roboport Size)
Replies: 9
Views: 5809

Re: 4 Lane Railsystem with Solar and Piping (Roboport Size)

I think I get it now. I now have buffers in all directions to pick up trains. The normal signals always come before a buffer, don't they? The Chain signals would be placed in such a way that the crossing sections are as small as possible or is that wrong? Thank you. I think the signaling of the trai...
by Stin
Sat Nov 10, 2018 1:49 pm
Forum: Railway Setups
Topic: 4 Lane Railsystem with Solar and Piping (Roboport Size)
Replies: 9
Views: 5809

Re: 4 Lane Railsystem with Solar and Piping (Roboport Size)

Before I start with all the details. What about this T intersection? I used chain signals most of the time. I'm never so sure, though 0eNql3e2OHceNxvF7mc9SUCSrX45vZREsYmeQHUCRDFlZbBD43leypbFsd0n8HX3UoA/Frqe6Xv7FIv/z8P2rfz3++Pbp9buH7/7z8PTDm9c/PXz3X/95+OnpH6//9urD3979+8fHh+8ent49/vPhxcPrv/3zw7/e/u3p1...
by Stin
Sat Nov 10, 2018 12:13 pm
Forum: Railway Setups
Topic: 4 Lane Railsystem with Solar and Piping (Roboport Size)
Replies: 9
Views: 5809

Re: 4 Lane Railsystem with Solar and Piping (Roboport Size)

As far as I can see there will be little left for me but to plan the stations and the T-Junction with more segments.
by Stin
Sat Nov 10, 2018 11:36 am
Forum: Railway Setups
Topic: 4 Lane Railsystem with Solar and Piping (Roboport Size)
Replies: 9
Views: 5809

Re: 4 Lane Railsystem with Solar and Piping (Roboport Size)

I have to admit that intersection design is still difficult for me. i have orientated myself at existing crossings. unfortunately i did not find any T-crossings that fit into my system I chose the 4 lane variant because it seemed to fit well into a segment. I oriented myself to the 4-lane traditiona...
by Stin
Sat Nov 10, 2018 9:05 am
Forum: Railway Setups
Topic: 4 Lane Railsystem with Solar and Piping (Roboport Size)
Replies: 9
Views: 5809

Re: 4 Lane Railsystem with Solar and Piping (Roboport Size)

i have improved my english a little bit and described it more detailed. I am not a native speaker.

I will delete this post later.
by Stin
Fri Nov 09, 2018 7:44 pm
Forum: Railway Setups
Topic: 4 Lane Railsystem with Solar and Piping (Roboport Size)
Replies: 9
Views: 5809

4 Lane Railsystem with Solar and Piping (Roboport Size)

Hallo The idea is to unite the rail network with the logistic network and the liquid transport. The remaining free area is to be used for power generation. The blueprints are divided into sizes that correspond to the logistical range of the Roboports. The rail network is very modular and easy to set...

Go to advanced search