Inspired by viewtopic.php?f=8&t=22458
THX bro
Official MOD, the whole system output following things:
Input materials: iron copper plastic battery Hivecore
Outputs: 4 colors bottles,defense robot,other things
System workflow:
1. Initially area2 generat red signal 50, if the number of copper wire is less than 50 (under the initial state there is no copper wire in zone 3)then start product copper wire, iron gears and green board as well. Meanwhile the green claw(plastic=0 battery=0) start releasing plastic & battery
2. Box in zone 3 input the total amount into green line
3.Aera5 input the transfer amount into redline and take 50 times then put into the Green Line as a yellow singal, In aera3 if the blue clock signal more than yellow signal(that means the belt in the first part are empty)than the green claw start releasing products, if the clock blue signal is less than the yellow signal (that means the belt in the first part are going to be fully loaded) than the claws stopped releasing and start stocking products until the smart box in area5 is cleared (the belt in the first part has been emptied)
4. blueprint and extend available
5. made in China
basis on red/green line & Calculator
-
- Manual Inserter
- Posts: 2
- Joined: Sun May 29, 2016 5:09 pm
- Contact:
-
- Manual Inserter
- Posts: 2
- Joined: Sun May 29, 2016 5:09 pm
- Contact: