[0.16.51] Build-order effecting what gets power
[0.16.51] Build-order effecting what gets power
When a power generating entity is shared between two electric networks, the one that was connected first gets full priority. In the image posted, if the left-most pole gets placed first, the radars will get power, and not the inserter. If the right-most pole is placed first, the inserter will get power, and the radars will get the excess. I expected the power to be shared.
- Attachments
-
- Untitled.png (2.15 MiB) Viewed 1666 times
Re: [0.16.51] Build-order effecting what gets power
Thanks for the report however I don't consider this worth working on. Just don't make split networks from 1 producer if you don't have enough power to power all things connected.
If you want to get ahold of me I'm almost always on Discord.
Re: [0.16.51] Build-order effecting what gets power
Interesting. Perhaps this can be used in a warning system. Will investigate when i can.
"No! This one goes there! That one goes There! Right?!"