Steps to reproduce
- Place a ghost of an outbound underground belt (belt direction coming out of the ground)
- Attempt to place a blueprint of an identical underground belt over the existing ghost
The blueprint should be able to be placed without conflict.
Actual results
The existing ghost of the outbound underground belt conflicts and prevents blueprint placement.