Appreciate the fast reply. That make sense in principal, however, I do have one follow-up. If I paste a circuit disabled inserter, shouldn't it also make one swing if valid source and target on the first tick too?
For example, if I cut and paste this inserter, since it doesn't get disabled until ...
Search found 3 matches
- Wed Dec 31, 2025 10:53 pm
- Forum: Not a bug
- Topic: [2.0.72] Buffer/Requester chests disabled by circuit make one request when placed by blueprint or ctrl+v
- Replies: 2
- Views: 235
- Wed Dec 31, 2025 10:15 pm
- Forum: Not a bug
- Topic: [2.0.72] Buffer/Requester chests disabled by circuit make one request when placed by blueprint or ctrl+v
- Replies: 2
- Views: 235
[2.0.72] Buffer/Requester chests disabled by circuit make one request when placed by blueprint or ctrl+v
1. What did I do?
When placing a requester or buffer chest with active requests, but the chest is disabled by circuit condition, the chest will still make 1 request before being disabled by the circuit condition.
2. What happened?
In the attached example, I have a requester and buffer chest ...
When placing a requester or buffer chest with active requests, but the chest is disabled by circuit condition, the chest will still make 1 request before being disabled by the circuit condition.
2. What happened?
In the attached example, I have a requester and buffer chest ...
- Sun Jul 02, 2017 6:19 pm
- Forum: Won't fix.
- Topic: [0.15.23] Can't plan to build rail on a deconstructing rail
- Replies: 2
- Views: 2118
Re: [0.15.23] Can't plan to build rail on a deconstructing rail
Rseding91,
Would it be worth considering the idea of cancelling a deconstruction plan if you place a blueprint of the same thing back on top of it? I've run into this issue described fairly often when i go about upgrading rail intersections, and if i don't catch it, i can end up with non-functional ...
Would it be worth considering the idea of cancelling a deconstruction plan if you place a blueprint of the same thing back on top of it? I've run into this issue described fairly often when i go about upgrading rail intersections, and if i don't catch it, i can end up with non-functional ...