Ahhh ... I was missing the "Each * -2 -> Each" on the unloader. That's very clever! It allows for a reasonable overfill on loading to not cause an unloading loop.
I've made up some logic diagrams for increasingly complex stations.
Green / Red arrows are circuit cabling.
Black arrows are to show ...
Search found 4 matches
- Tue May 23, 2017 1:46 pm
- Forum: Logistic Train Network
- Topic: old LTN discussion thread
- Replies: 858
- Views: 369422
- Tue May 23, 2017 7:29 am
- Forum: Logistic Train Network
- Topic: old LTN discussion thread
- Replies: 858
- Views: 369422
Re: [Mod 0.14/0.15] Logistic Train Network 1.2.7
So, how, in the brave new world of "Stops output expected inventory" do you do a multi-provider/multi-requester setup?
The station output no longer sends a negative inventory that you can use to block off one side by the "Anything < 0" method.
If the train is to unload then only the train ...
The station output no longer sends a negative inventory that you can use to block off one side by the "Anything < 0" method.
If the train is to unload then only the train ...
- Wed Aug 17, 2016 12:01 am
- Forum: Combinator Creations
- Topic: Resource counting with combinators
- Replies: 51
- Views: 48063
Re: Resource counting with combinators
Yep. Combinators are a surefire way to inspire frustration that's for sure :)
I've done many combinator projects in the past, but the thing they all had in common was that phases and timing didn't play a part. They have all been contraptions that worked with total levels of stuff and then did other ...
I've done many combinator projects in the past, but the thing they all had in common was that phases and timing didn't play a part. They have all been contraptions that worked with total levels of stuff and then did other ...
- Tue Aug 16, 2016 10:08 am
- Forum: Combinator Creations
- Topic: Resource counting with combinators
- Replies: 51
- Views: 48063
Re: Resource counting with combinators
So, with the simple decider counter with reset described above ... how would I store the value of the counter for use elsewhere in the factory upon receipt of the reset signal?
Imagine a loop belt that has 10 copper plate on it and a single coal (for the reset signal). How can I get 10 copper as a ...
Imagine a loop belt that has 10 copper plate on it and a single coal (for the reset signal). How can I get 10 copper as a ...