Steps to Reproduce
- Deploy an entity
- Create an upgrade task for that entity
- Create an upgrade task for the upgrade task into a third entity
- Undo the last upgrade task
- Reverted to state 2
- Reverted to state 1
- Redoing results in the state 3, skipping 2
- Step 2 no longer exists in history
See Also
- 126798: [2.0.34] Super-force upgrading into logistical chest loses its control behaviour
- 126792: [2.0.34] Undoing power pole deployment connects previously disconnected networks
Click to expand the recording