Page 1 of 1

[0.14.22] Concrete placement, by hand(manual) or by robot

Posted: Mon Mar 06, 2017 3:56 pm
by rorror
Concrete placement, by hand(manual) or by robot there is diffrent beheave near water.

When placing concrete by hand near water, there seems to be a minimal distance of 2or3 that you can't place concrete.
When you make a blueprint of concrete, and paste it near water, your able to concrete those places..
One of the 2 above seems to be wrong.

Re: [0.14.22] Concrete placement, by hand(manual) or by robot

Posted: Mon Mar 06, 2017 4:02 pm
by rorror
The image "With robots" you can see that robots can place near water.

The image without robots, you can see the diffrence (i later pasted the blueprint over it, so robots can fill it in)

Re: [0.14.22] Concrete placement, by hand(manual) or by robot

Posted: Mon Mar 06, 2017 4:15 pm
by Rseding91
No, it's limited just like manual building is.

Can you reproduce it without any mods? Because I suspect a mod you're using is changing things.

Re: [0.14.22] Concrete placement, by hand(manual) or by robot

Posted: Mon Mar 06, 2017 4:23 pm
by rorror
I have tested it in a older save game, a mod should have changed it.
However i like it more when it is filled to the water. Its that squary there.