[0.13.15] Assembling machine speed not used in time estimate
Posted: Fri Aug 12, 2016 7:06 pm
Not sure if this is a bug or a suggestion.
An Assembling machine 1 has a production speed of 0.5, meaning half as fast as normal.
However the building menu of the Assembling machine doesn't say that it will take 1 second to make an iron gear wheel.
An Assembling machine 1 has a production speed of 0.5, meaning half as fast as normal.
However the building menu of the Assembling machine doesn't say that it will take 1 second to make an iron gear wheel.