[boskid][0.18.32] Energy overproduction in overlapping electric networks
Posted: Tue Jun 23, 2020 5:30 pm
Old bug returned 28249.
Steam turbines and engines in overlapping networks connected with switch will overproduce energy and waste it. Solar panels are "ok" only because they underproduce power when networks are not connected (just single pole near panel will reduce output of panel in half). Didn't tested accums.
Steam turbines and engines in overlapping networks connected with switch will overproduce energy and waste it. Solar panels are "ok" only because they underproduce power when networks are not connected (just single pole near panel will reduce output of panel in half). Didn't tested accums.
Screenshots