Page 1 of 1

[0.5.1] 2 copper wires per time bug or feature?

Posted: Sun Jun 16, 2013 10:15 pm
by ssilk
Could it be, that the inserters can move 2 copper wires at the same time?

I produce advanced electric circuits. 3 factories in a triangle:

Code: Select all

       v                      v
copper-wire     >   electric circuits
         v            v
          advanced e.c.
When I count it, the inserter from copper-w. to electric c. moves 2 times per e.c. The inserter from copper-wire to a.e.c. moves 3 times.

This is only explainable, if the inserters can grab 2 items per move.

Re: [0.5.1] 2 copper wires per time bug or feature?

Posted: Sun Jun 16, 2013 11:54 pm
by ssilk
Ah, oh god, me stupid. Inserter stack size bonus developed...

Re: [0.5.1] 2 copper wires per time bug or feature?

Posted: Mon Jun 17, 2013 1:31 am
by kovarex
:)