Some goals are in wrong order
Posted: Sun Mar 17, 2019 6:47 am
Most goals are ordered with the first goal at the bottom of the list.
However when it comes to the electric pole we are directed to connect before we have built the assembler that is to be connected.
And later we are told to evacuate the area before gathering "some" of our equipment.
However when it comes to the electric pole we are directed to connect before we have built the assembler that is to be connected.
And later we are told to evacuate the area before gathering "some" of our equipment.