QOL/Upgrading -> Upgrade-Plan
Posted: Fri Jun 29, 2018 3:24 pm
Add another plan to blueprint/deconstruction named "upgrade-plan".
The color could be yellow.
- all objects marked by this plan will be replaced with the next level of it.
- It can be configured to upgrade just 1 level or to the max level available by logistic network
-- for example you mark a yellow belt, a red belt and a L1 assembler they will be replaced by red/blue/L2 assembler or by blue/blue/L3 assembler
- It also can be configured to use as downgrade plan (also 1-step or max)
- the construction robots will fly there with the upgrade on board, place it and fly back with the replaced item (rbot picks blue belt from red chest, flies to yellow belt, places blue, picks yellow, delivers yellow to logistic network)
The color could be yellow.
- all objects marked by this plan will be replaced with the next level of it.
- It can be configured to upgrade just 1 level or to the max level available by logistic network
-- for example you mark a yellow belt, a red belt and a L1 assembler they will be replaced by red/blue/L2 assembler or by blue/blue/L3 assembler
- It also can be configured to use as downgrade plan (also 1-step or max)
- the construction robots will fly there with the upgrade on board, place it and fly back with the replaced item (rbot picks blue belt from red chest, flies to yellow belt, places blue, picks yellow, delivers yellow to logistic network)