Ghosts subtract signal value
Posted: Tue Jun 26, 2018 3:51 pm
Simply make construction ghosts subtract their needs from affected logistics network signals.
Laying down 500 inserters within a logistic network construction area with 750 inserters available will immediately reduce the inserter signal to 250.
Laying down 500 inserters within a logistic network construction area with 250 inserters available will immediately reduce the inserter signal to -250
Laying down 500 inserters within a logistic network construction area with 750 inserters available will immediately reduce the inserter signal to 250.
Laying down 500 inserters within a logistic network construction area with 250 inserters available will immediately reduce the inserter signal to -250