Page 1 of 1

Ghosts subtract signal value

Posted: Tue Jun 26, 2018 3:51 pm
by adam_bise
Simply make construction ghosts subtract their needs from affected logistics network signals.

Laying down 500 inserters within a logistic network construction area with 750 inserters available will immediately reduce the inserter signal to 250.

Laying down 500 inserters within a logistic network construction area with 250 inserters available will immediately reduce the inserter signal to -250