1. Removed productivity module from electric miner.

2. The bonus for productivity wasn't removed after removing the module, or replacing the electric miner. Also all electric miners now built from new retain the bonus, and the bonus also stacks with new modules inserted.

3. Bonus is taken off for that electric miner. New/replaced miners have no bonus applied.
Electric Miners Module Error
Electric Miners Module Error
ElectricMiners.gif (64.1 MiB) Viewed 1344 times
Gif shows me looking at the miner, removing the module, the purple bar stays, so I close reopen the miner, and the purple bar remains. I remove the miner, create a new one and pop it down, it retains the purple bar, putting in another module stacks the bonus.

Re: [15.10] - Electric Miner Keep Prod Bonus Post Module Removal

Posted: Sat May 13, 2017 8:56 pm
by Klonan
Thanks for the report,

Do you have mining productivity technologies researched?

Re: [15.10] - Electric Miner Keep Prod Bonus Post Module Removal

Posted: Sat May 13, 2017 9:00 pm
by Rseding91
That's by design. You researched the mining productivity research which gives all mining drills additional productivity outside modules :D

Re: [15.10] - Electric Miner Keep Prod Bonus Post Module Removal

Posted: Sat May 13, 2017 9:04 pm
by TreefrogGreaken
Klonan wrote:Thanks for the report,

Do you have mining productivity technologies researched?
Ahhhh yes i do! That'd be why then. Totally forgot about them.

Maybe beneficial to have a little dialog box showing a +XX% when the miner is open? Also on the dialog window on the right, as it only shows the bonus applied by the module, not the researches.