How to synchronize two inserters?
Posted: Sat Mar 19, 2016 8:46 pm
I thought this would be much more straight forward, but after looking online and doing some experiments with circuit networks, I can't figure out how to synchronize two smart inserters as strictly as I'd like.
Here's the deal:
-Smart_Inserter_1 is staring at a looped transport belt and trying to feed an Assembly Machine with Batteries.
-Smart_Inserter_2 is positioned in between where all my Batteries are produced and the transport belt that feeds Smart_Inserter_1.
Any time Smart_Inserter_1 takes a number of Batteries off the transport belt loop, I want Smart_Inserter_2 to add that exact number of Batteries back on.
If Smart_Inserter_2 has to wait to receive the Batteries from a slow factory, I want it to remember exactly how many Batteries Smart_Inserter_1 has taken in the meantime.
I figure this problem has been encountered and solved by more experienced players than me - so I'd appreciate any help and can provide mroe details if necessary.
Here's the deal:
-Smart_Inserter_1 is staring at a looped transport belt and trying to feed an Assembly Machine with Batteries.
-Smart_Inserter_2 is positioned in between where all my Batteries are produced and the transport belt that feeds Smart_Inserter_1.
Any time Smart_Inserter_1 takes a number of Batteries off the transport belt loop, I want Smart_Inserter_2 to add that exact number of Batteries back on.
If Smart_Inserter_2 has to wait to receive the Batteries from a slow factory, I want it to remember exactly how many Batteries Smart_Inserter_1 has taken in the meantime.
I figure this problem has been encountered and solved by more experienced players than me - so I'd appreciate any help and can provide mroe details if necessary.