Re: Rocket Defense Assembling Facility
Posted: Thu Feb 19, 2015 9:25 pm
Figured I would post my current progress. (Ended up not using the map I posted, figured it was going to be too easy with the resource level I set it to)
Currently only using gun turrets, no lasers. 100% running on boiler power with no solar or accumulators. My goal is to hit 60 RDPH 100% on coal power.
I have everything researched at this point and am building the infrastructure to hit the mark. During the full research phase I only used productivity and speed modules. Going for the RDPH challenge I will be using lots of efficiency modules.
Current plan: (minimum machine levels for production needs)
Furnaces: 8428(2969 for iron, 5459 for copper) with 2 efficiency 2 modules
Assemblers: 3286 MIN with 1 Speed 3 and 3 Efficiency 3 modules in each
Chemical Plants: 263 with 2 efficiency 3 modules (not counting cracking plants)
Steam Engines: 887 to run machines above
Boilers: 1242 for machines above (using 10 x 14 model)
Miners: 9740 ( 3231 iron, 5942 copper, 566 coal <-- probably a little low) using 3 efficiency 1 in each miner
Refineries: 256 with 2 efficiency 2 modules
Chemical Plants (cracking): 1280, 2 efficiency 2 modules
Wells: 2560 wells (depleted) with 2 speed 3 modules
Steam Engines for Miners / Refineries: 1300
Boilers for Miners / Refineries: 1820
Will need a few additional coal miners to feed the boiler lines and then a power line to feed the power lines etc.
At this point I have the factory building the factory parts and producing military supplies to clear the aliens out, build rail lines etc. Power usage is only 80 - 90 MW atm, well below my peak of 115 MW when pushing research full tilt.
Currently only using gun turrets, no lasers. 100% running on boiler power with no solar or accumulators. My goal is to hit 60 RDPH 100% on coal power.
I have everything researched at this point and am building the infrastructure to hit the mark. During the full research phase I only used productivity and speed modules. Going for the RDPH challenge I will be using lots of efficiency modules.
Current plan: (minimum machine levels for production needs)
Furnaces: 8428(2969 for iron, 5459 for copper) with 2 efficiency 2 modules
Assemblers: 3286 MIN with 1 Speed 3 and 3 Efficiency 3 modules in each
Chemical Plants: 263 with 2 efficiency 3 modules (not counting cracking plants)
Steam Engines: 887 to run machines above
Boilers: 1242 for machines above (using 10 x 14 model)
Miners: 9740 ( 3231 iron, 5942 copper, 566 coal <-- probably a little low) using 3 efficiency 1 in each miner
Refineries: 256 with 2 efficiency 2 modules
Chemical Plants (cracking): 1280, 2 efficiency 2 modules
Wells: 2560 wells (depleted) with 2 speed 3 modules
Steam Engines for Miners / Refineries: 1300
Boilers for Miners / Refineries: 1820
Will need a few additional coal miners to feed the boiler lines and then a power line to feed the power lines etc.
At this point I have the factory building the factory parts and producing military supplies to clear the aliens out, build rail lines etc. Power usage is only 80 - 90 MW atm, well below my peak of 115 MW when pushing research full tilt.