Production Alarms
Posted: Fri Nov 09, 2018 2:03 pm
Can a late/end-game alarm panel be added for the Production Data so that the following could be plugged in:
If Iron Plate Production is less than Iron Plate Consumption for 10 Minutes, Trigger Alarm.
Due to the nature of the game, this is not something that is possible to do when constructing mega bases with the circuit network.
If Iron Plate Production is less than Iron Plate Consumption for 10 Minutes, Trigger Alarm.
Due to the nature of the game, this is not something that is possible to do when constructing mega bases with the circuit network.