Page 1 of 1

[0.17.14] 250h and 1000h production interval divisions don't seem to make sense

Posted: Fri Mar 15, 2019 10:21 pm
by zarty55
The 250h interval production tab is divided in a weird unit. It ranges from 0 - 4.2 (it seems that each unit is 60h, same with 1000h which ranges from 0 - 17).

Here is a screenshot showing the tab at 250h interval.

Image

My suggestion would be to change the intervals to be 1 day = 1 unit. Though I'm not sure if this is intentional, I just don't think it feels right. Specially since every other interval lower than 250h uses a nice unit like seconds, minutes and hours.

Just a last reminder, every tab (not just production, the fluids, buildings and pollution) also have these weird intervals.