Request (Done) - Add a second pipe connection to Angel's Flare Stack
Posted: Thu Jul 25, 2019 1:53 pm
Would anyone be willing to do that?
The issue is that there is only a pipe connection at the left of the 2×2 building. Meaning that if you use a 3×3 chemical plant for instance, and want to burn the gas at the right, it will fit perfectly. But if you want to burn the gas at the left, the Flare Stack will poke out to the left.
Visually, it's not exactly elegant, but practically, if one were to use something like GDIW to permutate outputs, and flip a blueprint, the whole thing would have to be modified to fit the pipes connections of the Flare Stacks.
I'm requesting it here since I suppose that if Angel made it like that, he might have his reasons.
Thanks in advance if anyone takes up this request.
The issue is that there is only a pipe connection at the left of the 2×2 building. Meaning that if you use a 3×3 chemical plant for instance, and want to burn the gas at the right, it will fit perfectly. But if you want to burn the gas at the left, the Flare Stack will poke out to the left.
Visually, it's not exactly elegant, but practically, if one were to use something like GDIW to permutate outputs, and flip a blueprint, the whole thing would have to be modified to fit the pipes connections of the Flare Stacks.
I'm requesting it here since I suppose that if Angel made it like that, he might have his reasons.
Thanks in advance if anyone takes up this request.