Engine and Robot Department
Posted: Fri Jul 18, 2014 4:52 pm
Here is another schematic I put together for engine and robot production. Since these items are not needed in other departments (except for the pipe), all of the items are delivered to a smart chest in limited amounts using linked smart inserters. If mass production of cars and locomotives is desired, these items could certainly be added to this line.
As always, items are fed up into the department and produced items are returned down to the main line.
As always, items are fed up into the department and produced items are returned down to the main line.