T1-T2-T3 efficient production

Circuit-free solutions of basic factory-design to achieve optimal item-throughput.
Involving: Belts (balancers, crossings), Inserters, Chests, Furnaces, Assembling Devices ...
Optimized production chains. Compact design.
Please provide blueprints!
Forum rules
Circuit-free solutions of basic factory-design to achieve optimal item-throughput
Post Reply
User avatar
MBas
Long Handed Inserter
Long Handed Inserter
Posts: 63
Joined: Fri Jan 06, 2017 12:57 pm
Contact:

T1-T2-T3 efficient production

Post by MBas »

Hello.

Here is my version of T1+T2+T3 production.

Have a nice day!
Attachments
lab.png
lab.png (2.56 MiB) Viewed 3679 times

RoddyVR
Long Handed Inserter
Long Handed Inserter
Posts: 96
Joined: Thu May 07, 2015 6:29 am
Contact:

Re: T1-T2-T3 efficient production

Post by RoddyVR »

What does efficient mean to you?
You could mean prety or space efficient, in which case my reply has no meaning,

I assume that you mean no bottle necks that could be fixed by another assembly machine.

And it seems to me that your 1 gear assembly needs to be doubled (almost) to keep up with the rest of the setup.
its recepie makes 2 gears per second, but you're using it for;
red beakers = 1 per second
inserter for green sci = 1 per second
belt for green sci = .5 per second (need 1 belt recepie done every 2 seconds)
inserter for blue sci = 1 per second

right now (in screen shot) seems to be iron input, but even if you fix that, the gear assembly will almost halve the speed at which you clearly planned to produce beakers.
I would suggest changing the belt assembler to gears, and putting a belt assembly below it (proly have to dive the iron belt under it)