Page 1 of 1

[Dominik][0.17.17] Pipe-to-ground built behind ghost

Posted: Fri Mar 22, 2019 11:03 am
by Degraine
In order:
  • Place down a blueprint that has a pipe-to-ground pair.
  • Build one of the pair manually.
  • Place the second one further away than the remaining ghost.
  • Delete the remaining ghost.
The overlay will show that the two pipes-to-ground are connected, but fluid will not transfer between them. Rotating one of them forward and back will link them correctly.

Re: [Dominik][0.17.17] Pipe-to-ground built behind ghost

Posted: Fri Mar 22, 2019 1:58 pm
by Dominik
Hi, thanks for report. This might be related to one issue I have on my list, but this would be a nice way to reproduce it. We will see.

Re: [Dominik][0.17.17] Pipe-to-ground built behind ghost

Posted: Mon Mar 25, 2019 10:26 am
by Dominik
It was something that I missed when rewriting the ghost mechanism. Thanks again.