Search found 45 matches
- Tue Apr 09, 2019 2:12 am
- Forum: Show your Creations
- Topic: Self adjusting Kovarex based on demand
- Replies: 96
- Views: 36708
Re: Self adjusting Kovarex based on demand
Really nice clean design! I think it has the potential with a few more adjustments, as it clogged up on me before it output any U-235 in testing in sandbox. I just added ore and power. Bulldog kovarex.jpg It looks like this splitter gets clogged with U-238 from kovarex production clogged splitter.jp...
- Sun Mar 31, 2019 8:29 pm
- Forum: Show your Creations
- Topic: Self adjusting Kovarex based on demand
- Replies: 96
- Views: 36708
Re: Self adjusting Kovarex based on demand
This is an updated version of my Uranium Processing that is even more user friendly/foolproof. It will now temporarily hold the U-238 while the kovarex units are priming,and will recirculate said U-238 back into the system as the kovarex units fire up. Slowly at first then full on when at least two ...
- Sun Mar 31, 2019 1:50 pm
- Forum: Show your Creations
- Topic: Self adjusting Kovarex based on demand
- Replies: 96
- Views: 36708
Re: Self adjusting Kovarex based on demand
My Uranium Processing Facility. kovarex.jpg This just add ore processing row will -self load -self adjust based on needs/usage -recirculate 238 produced from spent fuel cells. The centrifuges will start up without any babysitting, but is ok to add 235 if you have some already. If left alone it will ...
- Sat Feb 24, 2018 6:16 pm
- Forum: Won't fix.
- Topic: [16.25] Steam turbine in two switch connected networks counted twice
- Replies: 3
- Views: 1442
Re: [16.25] Steam turbine in two switch connected networks counted twice
Happens with any configuration of power poles and power sources.
- Sat Feb 24, 2018 1:11 pm
- Forum: Won't fix.
- Topic: [16.25] Steam turbine in two switch connected networks counted twice
- Replies: 3
- Views: 1442
[16.25] Steam turbine in two switch connected networks counted twice
When a Big Electric Pole is connected to my nuclear power plant through a power switch, if the supply area of the big electric pole touches a steam turbine, it is counted twice in the electrical interface screen when the switch is turned on. Didn't check for other power poles.